A.  R&D SCHEMES (ROADS)

(Amount Rs. in lakhs)

 

Sl. No.

 

 

Scheme No.

 

Description

 

Sanctioned Cost

 

Date of Sanctioned

 

Target of Completion

 

Agency

 

1.

 

R-84

 

"Preparation of Manual for Development of 6 Lane National Highways"

 

5.50

 

25/11/2005

 

2006-2007

 

IRC

 

2.

 

R-85

 

"Investigation on Field Performance of Bituminous Mixes with Modified Binders"

 

37.50

 

28/03/2006

 

2009-2010

 

IIT, Madras

 

3.

 

R-86

 

"Guidelines for Soil Nailing Technique in Highway Engineering"

 

28.11

 

28/03/2006

 

2009-2010

 

Indian Institute of Science, Bangalore

 

B.  R&D SCHEMES (TRAFFIC & TRANSPORTATION)

(Amount Rs. in lakhs)

 

Sl. No.

 

Scheme No.

 

Description

 

Sanctioned cost

 

Date of Sanctioned

 

Target of completion

 

Agency

 

 

1.

 

 

T-5

 

"Development of GIS based National Highways Information System"

 

1006.18

 

01/08/2005

 

2008-2009

 

CRRI

 

2

T-6

“Proposal for a pilot study on effect of overloading on road infrastructure”

13.19

6.09.2006

2006-07

CRRI

 

C.  R&D SCHEMES (BRIDGE)

(Amount Rs. in lakhs)

S.No.

Scheme No.

Description

Sanctioned Cost

Date of Sanction

Target of completion / present status

Agency

1.

B-25

Studies for aerodynamic stability of cable stayed bridge decks

16.00

 

26-3-99

October,06

CRRI

2.

B-33

Determination of scour depth(general bed, channel piers) in bouldery beds under high stream velocities 

13.66

28.08.01

October,06

IIT,
Kharagpur

3.

B-34

Creation of complete range of independent testing facilities for expansion joints at CRRI

220.00

30.6.05

June, 2008

CRRI

(Last updated on 10/10/06)