A. R&D SCHEMES (ROADS)
(Amount Rs. in lakhs)
|
Sl. No.
|
Scheme No. |
Description |
Sanctioned Cost |
Date of Sanctioned |
Target of Completion |
Agency |
|
1. |
R-84 |
"Preparation of Manual for Development of 6 Lane National Highways" |
5.50 |
25/11/2005 |
2006-2007 |
IRC |
|
2. |
R-85 |
"Investigation on Field Performance of Bituminous Mixes with Modified Binders" |
37.50 |
28/03/2006 |
2009-2010 |
IIT, Madras |
|
3. |
R-86 |
"Guidelines for Soil Nailing Technique in Highway Engineering" |
28.11 |
28/03/2006 |
2009-2010 |
Indian Institute of Science, Bangalore |
B. R&D SCHEMES (TRAFFIC & TRANSPORTATION)
(Amount Rs. in lakhs)
|
Sl. No. |
Scheme No. |
Description |
Sanctioned cost |
Date of Sanctioned |
Target of completion |
Agency
|
|
1.
|
T-5 |
"Development of GIS based National Highways Information System" |
1006.18 |
01/08/2005 |
2008-2009 |
CRRI
|
|
2 |
T-6 |
“Proposal for a pilot study on effect of overloading on road infrastructure” |
13.19 |
6.09.2006 |
2006-07 |
CRRI |
C. R&D SCHEMES (BRIDGE)
(Amount Rs. in lakhs)
|
S.No. |
Scheme No. |
Description |
Sanctioned Cost |
Date of Sanction |
Target of completion / present status |
Agency |
|
1. |
B-25 |
Studies for aerodynamic stability of cable stayed bridge decks |
16.00
|
26-3-99 |
October,06 |
CRRI |
|
2. |
B-33 |
Determination of scour depth(general bed, channel piers) in bouldery beds under high stream velocities |
13.66 |
28.08.01 |
October,06 |
IIT, |
|
3. |
B-34 |
Creation of complete range of independent testing facilities for expansion joints at CRRI |
220.00 |
30.6.05 |
June, 2008 |
CRRI |
(Last updated on 10/10/06)