Research Schemes (Bridges)

A) Details of ongoing Bridge Research Schemes of this Ministry

(As on 23rd October, 2009)

S.No

Name of  Research scheme

Executing Institute/Agency

Particulars

 

1

 

Creation of complete range of independent testing facilities for expansion joints at CRRI.(B-34)

 

(F.No. RW/NH-34061/1/2005-S&R(B)

 

Central Road Research Institute (CRRI)

 

Sanctioned date: 30th June 2005

 

Revised target date of completion:

Yet to be fixed 

 

 Cost: Rs 580 lakhs

 

Ministry’s share= 220 lakhs

 

CRRI’s share = 360 lakhs

 

2

 

Development of an expert system for distress diagnostics of concrete bridges (Fuzzy based) (B-35).

(F.No. RW/NH-34061/2/2008-S&R(B)

 

Indian Institute of Technology,  Delhi.

 

 

Sanctioned date: 27th May 2008

 

Target date of completion:

January, 2010

 

Cost: Rs50.00 lakhs

 

3

 

Development of Standard Drawings for Composite girders (with steel girders) ) (B-36).

(F.No. RW/NH-34066/2/2007-S&R(B)

 

Institute for  Steel Development and Growth

(INSDAG).

 

Sanctioned date: 25th July  2008

 

Target date of completion:

December, 2009

 

Cost: Rs16.70  lakhs

 

 

4

 

Development of Explanatory Commentary on Standard Specifications and Code of Practice for Road Bridge Section VI Composite Constructions Limit State Design (First Revision) ) (B-37).

(F.No. RW/NH-34066/6/2008-S&R(B)

 

Institute for  Steel Development and Growth

(INSDAG).

 

 

 

 

Sanctioned date:

 6th November  2008

 

Target date of completion:

July, 2010

 

Cost: Rs11.30  lakhs

Ministry’s share= 7.49 lakhs

 

 

 

S.No

Name of  Research scheme

Executing Institute/Agency

Particulars

 

5

 

Revision of Ministry’s Specifications for Roads and Bridges Works (B-38)

(F.No. RW/NH-34066/9/2000-S&R(B)

 

Indian Roads Congress (IRC)

 

Sanctioned date: 31st March 2009

 

Target date of completion:

October, 2010

 

Cost: Rs 40.00 lakhs

 

 

 

6

Explanatory commentary for Code of Practice for concrete Road bridges (Limit State Method) (B-39)

(F.No. RW/NH-35075/9/2006-S&R(B)

 

 

Indian Roads Congress (IRC)

 

Sanctioned date: 28th May 2009

 

Target date of completion:

January, 2010

 

Cost Rs 14.00 lakhs

 

7

Hydraulic investigations for design of raft foundations for bridges (B-40)

(F.No. RW/NH-36087/1/2009-S&R(B)

 

Indian Institute of Technology,  Mumbai

 

 Sanctioned date: 28th May 2009

 

Target date of completion:

June, 2011

 

Cost: Rs 22.008 lakhs

 

8.

Static and Dynamic Load Test for piles (B-41)

(F.No. RW/NH-34075/1/2009-S&R(B)

Indian Institute of Technology, Mumbai

Sanctioned date 23rd July, 2009

Target date of completion July 2011

Cost Rs.26.00 lakhs